
InStandart
Claimed
Custom CAD/BIM Automation & Engineering Software for EPC, Oil & Gas, and Construction
About company
InStandart builds custom CAD automation tools, BIM integrations, and engineering software for Construction & EPC, Oil & Gas, and Manufacturing companies. Since 2014, our team of 30+ engineering specialists has delivered 135+ projects across 15+ countries – including the UK, EU, Middle East, North America, and Australia.
We work where off-the-shelf CAD software falls short and where AI-generated code breaks: geometric computation engines, legacy system integrations (SAP S/4HANA, Oracle ERP, Teamcenter), multi-discipline coordination workflows, and domain-specific business logic. We complement manufacturer software (DOKA, PERI, Autodesk, AVEVA) – not replace it.
Core Specialization: CAD/BIM Engineering Automation
- CAD Plugin & Add-in Development – Custom solutions for AutoCAD, AutoCAD Plant 3D, Revit, AVEVA E3D & Diagrams, Intergraph Smart 3D, SolidWorks, Navisworks
- CAD–ERP/PLM Integration – Bi-directional sync between CAD/BIM models and SAP S/4HANA, Oracle ERP, Teamcenter, Ariba, Maximo
- BIM Coordination & Clash Detection – Centralized 3D model review platforms, automated clash management, version control, COBie data automation
- Engineering Calculation Automation – Formwork, scaffolding, MEP loads, structural calculations, stress validation (CAESAR II, PASS START)
- Operator Training Simulators & Digital Twins – Unity 3D-based training systems for industrial operations
- Custom Engineering Workflow Tools – Author supervision, as-built documentation, drawing data extraction, automated reporting
Proven Results
→ POSforAFS – Formwork Calculation Automation (Israel): Reduced calculation time from 3 months to 1 day. 70% cost reduction, 85% faster turnaround, zero manual calculation errors.
→ CAD/BIM–SAP Integration (Midstream Gas Processing, EPC): BoM data entry from 4 hours to under 15 minutes per package. Manual error rate from 15% down to under 2%. Engineering-to-procurement handover from 6+ weeks to 1 week. BoM entry time: 4 hours → 15 minutes per package. Error rate: 15% → under 2%.
→ 3D Model Review Platform (Industrial Construction): 50% faster review cycles, 80% fewer manual errors, 90% improvement in cross-discipline coordination. Compressed 10-day review cycles to 3–4 days.
Locations
Headquarters
United Kingdom, Wimborne
+44 7488 818010
Headquarters
United Kingdom, Wimborne
+44 7488 818010
Languages (1)
Communication
Preferred Communication Channels
Working models
Technical Support
Project Management Methodologies
Communication
Preferred Communication Channels
Working models
Technical Support
Project Management Methodologies
Focus
Other Services (80)%
100%
Portfolio





